Structural design
Project planning
Examination
Sewage bridge in Fuhlensee
Facts and figures
Client:
State capital Kiel
Object:
New construction of a 230 m long bridge (from 1931) over a large nature reserve to carry wastewater from Kiel and the surrounding communities to the sewage treatment plant
Design:
State capital Kiel
Services:
Structural design
Project planning
Examination
Site management
Special features:
- Construction of a pipeline on the existing route without interrupting wastewater operations
- Construction of two DN 1200 pipe strings parallel to the old bridge
- Staged construction by using only one line at a time
- 18 m deep concrete pile foundation at a distance of 15 m from the existing bridge with the old spacing of the supports offset by half a span in each case
For building inspections:
- Creation of comprehensive building documentation
- Photo documentation