Replacement road bridge A7

From the A7 via the L49 directly to Bordesholm

Facts and figures

Client:
Autobahn GmbH of the Federal Government
Object:
Demolition and replacement construction of Bw. 506 as well as construction and dismantling of the temporary bridge/bypass required for the construction period
Design:
Engineering team Trebes
Services:
Structural design
Project planning
Examination
Special features:
  • 2-span steel composite structure with open profiles, flat
    founded 
  • Crossing angle: 84.13gon
  • Bridge area: 813.13 m²
  • Span 2 x 23.85 m 
  • Width between the railings 17.05 m
  • Construction in existing buildings while traffic continues
    a temporary bridge