Replacement road bridge A7

Facts and figures
Client:
Autobahn GmbH of the Federal Government
Object:
Demolition and replacement construction of Bw. 506 as well as construction and dismantling of the temporary bridge/bypass required for the construction period
Design:
Engineering team Trebes
Services:
Structural design
Project planning
Examination
Special features:
- 2-span steel composite structure with open profiles, flat
founded - Crossing angle: 84.13gon
- Bridge area: 813.13 m²
- Span 2 x 23.85 m
- Width between the railings 17.05 m
- Construction in existing buildings while traffic continues
a temporary bridge