Structural design
Replacement construction of the L 135 road bridge

Facts and figures
Client:
State Agency for Road Construction and Transport Schleswig-Holstein, Itzehoe location
Object:
Demolition and replacement construction of the L 135 railway bridge, as well as construction and dismantling of the temporary bridge and bypass for pedestrian and bicycle traffic.
Design:
AZ Engineering Office for Structural Analysis
Services:
Structural design
Further information:
- Planning period: August 2023 to June 2024
- Power: Structural engineering LPH 4-5
- Construction cost: Approximately €2,900,000 (net)
-
Technical description:Integral single-span structure in reinforced concrete, deeply founded on cast-in-place concrete bored piles
- Crossing angle: 70,000gon
- Bridge area: 277.31 m²
- Span: 19.95 m
- Width between railings: 13.90 m






